Parking Lot

Project Description

The investigation for this project consisted of sampling, testing, evaluating the pavement structure including base, sub-base, and natural soil materials, and determining the cause(s) of the observed distress of the parking lot at the Redstone Golf Course in Humble, Texas. Distress in the parking lot was mainly in the form of cracking with isolated heaving and bulging at several locations. CA performed a detailed condition assessment including coring and excavations to sample, document, and evaluate the pavement system. Testing included petrographic examination and chemical and mineralogical analysis of the different materials comprising the pavement system, natural soil, stabilized subgrade, and selected materials. Further, CA's investigation included, among other things, evaluating the construction practices, quality control testing, and overall drainage and landscaping design.

Parking Lot
Parking Lot
Parking Lot
Parking Lot
Parking Lot
Parking Lot

Parking Lot
Parking Lot
Parking Lot
Parking Lot