NDT Assessment, and Repair of Cast-in-Place Concrete Framing
Carrasquillo Associates investigated deficiencies observed on the surface of the concrete for the second floor cast-in-place concrete framing, which consisted of conventionally reinforced beams, girders, column tops, and the second floor slab. CA reviewed the condition of the cast-in-place concrete to determine the extent of the deficiencies, to develop a repair protocol, and to selectively observe and document the repair work. CA’s investigation included a visual condition survey, non-destructive testing (NDT) using Ultrasonic Pulse Velocity (UPV) equipment, and concrete core sampling. CA’s visual condition survey identified several types of possible deficiencies. These included surface honeycombing, poor consolidation, internal voids, and visible lift lines and/or cold joints. CA demonstrated that the majority of the observed deficiencies were near surface and did not impact the structural integrity of the concrete structure. Based on CA’s recommendations, the project team decided that all of the observed deficiencies could be repaired.
Carrasquillo Associates investigated deficiencies observed on the surface of the concrete for the second floor cast-in-place concrete framing, which consisted of conventionally reinforced beams, girders, column tops, and the second floor slab. CA reviewed the condition of the cast-in-place concrete to determine the extent of the deficiencies, to develop a repair protocol, and to selectively observe and document the repair work. CA’s investigation included a visual condition survey, non-destructive testing (NDT) using Ultrasonic Pulse Velocity (UPV) equipment, and concrete core sampling. CA’s visual condition survey identified several types of possible deficiencies. These included surface honeycombing, poor consolidation, internal voids, and visible lift lines and/or cold joints. CA demonstrated that the majority of the observed deficiencies were near surface and did not impact the structural integrity of the concrete structure. Based on CA’s recommendations, the project team decided that all of the observed deficiencies could be repaired.